Binondo-Intramuros bridge on track for 2021 opening

The Binondo-Intramuros Bridge is on track to be completed this year amid the coronavirus pandemic, the Department of Public Works and Highways (DPWH) said at 15. The project’s overall progress is about 60 percent.

The bridge will improve the capacity and efficiency of the road transport network in Metro Manila by providing additional fix links and additional routes crossing the Pasig River.

The project is part of the Metro Manila Logistics Improvement Program to address the long-held dilemma of traffic gridlock in major roads by constructing new bridges crossing Pasig and Marikina Rivers, and Manggahan Floodway.

Source: pna.gov.ph

Inquiry / Info request
Online consultation / Free

Related page

Manila,
27°
Mostly Cloudy
5:56 am5:24 pm PST
Feels like: 31°C
Wind: 10km/h ENE
Humidity: 84%
Pressure: 1013.21mbar
UV index: 0
7 pm8 pm9 pm
27°C
27°C
28°C
ThuFriSat
33°C / 26°C
33°C / 26°C
31°C / 25°C

Philippines Calendar

November 2024
SMTWTFS
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Philippine Holidays

Inquiry

PVC Info Desk
Return Top Inquiry / Info request Online consultation / Free